See exactly what makes a basement apartment legal.
Explore a code-compliant second unit layer by layer — fire separations, egress, heating, alarms and more — drawn to the 2024 Ontario Building Code. Then choose the drawing package that fits your project.
Nine things an examiner checks. One model.
Hover or tap any numbered point to see what the Code requires, the exact article we design to, and how it shows up in your drawing package.
One firm, start to permit.
Site measure & feasibility
We check ceiling heights, entrance options and zoning before you commit to design.
Permit submission
We file the application and answer the city's comments until your permit is issued.
Engineering coordinated
Structural and mechanical consultants brought in and coordinated by us — not left to you.
Contractor support
Your contractor's questions answered throughout the build — so what's on the drawings gets built right.
Three ways to get your basement apartment permitted.
Every package is a complete, permit-ready set. The difference is how much design detail you want before construction starts.
Essential
For owners who know their layout and need a clean, permit-ready set.
- Complete permit drawing set to the 2024 OBC
- Fire separation, egress & life-safety details
- Kitchen & bathroom plans
- Supply & return register layout for permit
- Permit submission & city comment responses
Signature
For owners who want lighting and power planned, and their contractor aligned.
- Everything in Essential, plus
- Electrical plan — lighting, switches & receptacles
- Virtual meetings with you and your contractor at key milestones
- Double the design revisions
Complete
For investors and owners who want every finish decided before a single quote.
- Everything in Signature, plus
- Detailed mechanical drawing set
- Interior elevations — kitchen, bath & feature walls
- Finish & fixture schedule your contractor can price from
Every house is different, so we start with a free call to confirm yours is a good fit for a second unit, then quote the package that suits it. A new below-grade entrance, underpinning or other structural work requires a structural engineer — we coordinate it and quote it up front. Design revision rounds take place before your permit application is submitted; changes after the permit is issued require a formal revision with the city, quoted separately. City permit fees are paid directly to the municipality.
| What's in the set | Essential | Signature | Complete |
|---|---|---|---|
| Permit drawings — plans, sections, OBC notes | |||
| Fire separation, egress & alarm details | |||
| Kitchen & bathroom plans | |||
| Permit submission & city comment responses | |||
| Mechanical | Register layout | Register layout | Detailed set |
| Electrical plan (lighting, switches, receptacles) | — | ||
| Virtual meetings with you & your contractor | — | ||
| Interior elevations | — | — | |
| Finish & fixture schedule | — | — | |
| Design revision rounds (before permit submission) | 4 | 8 | 12 |
| Typical drawing turnaround | ~1.5 weeks | 2–3 weeks | 3–4 weeks |
Want it built by the team that drew it?
We now build finished basements, too. The same people who know every fire-stop and egress detail on your drawings run the job — so what passes on paper passes on site.
From first call to issued permit.
Free consultation
A quick call about your house, your goals and which package fits.
Measure & feasibility
We document existing conditions and flag height, entrance or zoning issues early.
Design & revisions
Layouts refined through your package's revision rounds until it's right.
Permit submission
We file, track the review and respond to every city comment.
Build
Hand the set to your contractor — or have Atlas build it.
Is your house a good fit for a second unit?
Tell us about your property. We'll call you to talk through zoning, ceiling height and entrance options, then recommend the right package and quote it.
- Free feasibility call
- Fixed quote before any work starts
- No obligation
Am I allowed to add a basement apartment?
Do I need a separate furnace for the basement unit?
C171 / C205) lets one heating system serve both units when smoke alarms are installed in each unit and a duct smoke detector shuts off fuel and power to the system. We'll tell you whether sharing or separating makes more sense for your house.Is my basement ceiling high enough?
9.5.3.1.(2)–(3)). We measure every low point during our site visit. If you're short, we can design underpinning or basement lowering into the same permit set with our structural engineer.What fire separation does a basement apartment need?
9.10.9.16.(4)). In existing houses, Part 11 can allow a 15-minute ceiling separation where smoke alarms throughout the house are interconnected (C156). Your drawings will specify the exact assembly.What happens if the city sends comments?
Can I change the design after the permit is issued?
Do you visit the site during construction?
Turn your basement into a legal, income-producing unit.
Book a free feasibility call. We'll confirm your house is a good fit for a second unit, recommend a package and give you a fixed quote.
